Overview of site before groundbreaking | Site plan showing boundaries and location | Floor and front elevation plan |
Another overview of site showing driveway view | Footers poured |
Foundation walls going up |
Foundation filled in and leveled, ready for concrete | Foundation block walls being filled with concrete | Filling the slab | First pass with the floats |
Wood delivered today, let's go! | About two hours later | End of the first day's work - 3 hours to this point | Car's eve view from the driveway |
Raise high the roof beam, carpenters... | Walls plumb and level, sheathing going on | Interior is full of braces | Today's site view | The pile is getting smaller | Fun with string |
Siding nearly finished | Needs a little more on the back side | Just some shingles and a dab of paint... | Inside view showing nice door installation |